STUDY OF THE GRAPH ANALYTIC METHOD OF DETERMINING THE WORKING MODE OF A PUMP DEVICE FOR REDUCING THE MINE FROM GROUNDWATER
Main Article Content
Abstract
This in the article n on finding and using reserves to increase the operational efficiency of basic equipment, determine the level of regulation of pump operation modes, as well as reduce energy and material costs for their operation in mining enterprises data given.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
References
. Б.Б.Некрасов “Задачник по гидравлике” гидромашинам и гидроприводу – М, “Высшая школа”, 1989г [2]. Shamayev, M. K., Toshtemirov, U. T., Alimov, S. M., Melnikova, T. E., Berdiyeva, D. K., & Ismatullayev, N. A. (2022). Determination of the Installation Density of Anchors in the Walls of a Working with a Quadrangular Cross Section. Child Studies in Asia-Pacific Contexts, 12(1), 362-367. https://www.e-csac.org/index.php/journal/article/view/68 [3]. O‘G‘LI, T. U. T. (2022). RESEARCH BY ENLARGING THE DIAMETER OF CARVING SPURS. Scienceweb academic papers collection. https://dbdxxb.cn/2022-4-toshtemirov-umarali-tulkin-ugli/